Quality, Service & Commitment

INTERRA NEWS

  • 26 Oct 2017

    INTERRA To Host Ribbon Cutting With Bolingbrook Mayor Celebrating Going Green

  • 21 Jul 2017

    Recipient Of Service Award Thanks INTERRA for Engineering Support With Jane Byrne Circle Interchange

  • 15 Mar 2017

    INTERRA, Inc. Full-Time Field Technician Openings in Franklin, WI

More News

Certified

Laboratory Certifications

  • IL & WI State DOTs
  • ASTM
  • AASHTO
  • USACE

 

Firm Certifications

  • DBE with IDOT
  • MBE with City of Chicago

Read More

Testimonials

Chicago O’Hare Airport, Terminal 6 Project: “We would like to extend our appreciation to you and all of your employees who worked on the Terminal 6 Project.  All work was performed professionally, accurately and thoroughly. Your commitment to quality and …

Read More

Battle Station 21, Great Lakes Naval Facility – Department of Navy

INTERRA Services

  Bearing pressure tests for foundations

  Field soil compaction testing

  Concrete field  and laboratory testing

  Mortar and grout testing

  Rebar inspections

  CMU block and brick sampling and testing

  Structural steel inspection and testing

  Asphalt testing

  Roof inspections

 Project Summary

The design-build team for this project, which included INTERRA as a key member, developed this $82 million ultra-high-tech training simulator of unprecedented scope and detail at the Navy’s only recruit training center.  Melding the best of entertainment technology, military training, design, and engineering; Battle Stations 21 includes a replica of a guided missile destroyer surrounded by water.  In a grueling 12-hour training “rite of passage,” naval recruits experience the sights, sounds, and smells of naval crisis situations. With the around-the-clock facility used by over 350 recruits at a time; durability, traffic flow, and attention to detail took on added importance.