Quality, Service & Commitment

INTERRA NEWS

  • 22 Jan 2018

    Civil Engineer Needed

  • 08 Dec 2017

    INTERRA Honored With 2017 IRTBA Green Industry Achievement Award For Green Initiatives

  • 26 Oct 2017

    INTERRA To Host Ribbon Cutting With Bolingbrook Mayor Celebrating Going Green

More News

Certified

Laboratory Certifications

  • IL & WI State DOTs
  • ASTM
  • AASHTO
  • USACE

 

Firm Certifications

  • DBE with IDOT
  • MBE with City of Chicago

Read More

Testimonials

Chicago O’Hare Airport, Terminal 6 Project: “We would like to extend our appreciation to you and all of your employees who worked on the Terminal 6 Project.  All work was performed professionally, accurately and thoroughly. Your commitment to quality and …

Read More

Modifications to State Road No. 90 (Tamiami Trail), FL

INTERRA Services

Interra’s scope of services consisted of providing construction inspection to Kiewit(Client) on the project, specifically bridge and roadway construction inspection.

Project Summary

The Tamiami Trail Project plans to create hydraulic conveyance capacity through the Tamiami Trail to allow a return to a more natural flow of water and prevent loss of and restore the ridge and slough vegetation through increased volume of water delivered to North East Shark River Slough.  The U.S. Army Corps of Engineers awarded the construction project to Kiewit Infrastructure South, Sunrise, FL in September 2009.

The project includes construction of a 1 mile-long bridge 2 miles east of the intersection of Tamiami Trail and Krome Avenue, which would allow water levels in the L-29 canal to reach 8.5 ft.  Approximately 9.7 miles of roadway would be reinforced to mitigate potential impact of the increased water level.