For this Illinois Tollway project INTERRA provided a Resident Engineer who managed and coordinated all onsite activity for compliance with the contract documents. This project included the replacement of a PCC I-beam and bridge deck of the superstructure. INTERRA Resident Engineer oversaw the installation of the acrylic and precast concrete noise abatement walls.